1989 Mazda 929 Engine Camshaft Follower Parts

Showing 1 - 1 of 1 products
Image
SKU
Product
Rating
Price

Original Equipment
  • This Original Equipment Manufacturer part is the same part that was made & installed by the car manufacturer at the factory where the car was produced.
  • When changing valve lifters, it is recommended that the lifters are allowed to "settle/seat" for a minimum of 30 minutes to allow excess oil to drain. If this recommendation is not followed, some valves will make contact with the piston, resulting in the valve to break at the collet groove. It is also ideal if the engine is allowed to rest over night before starting the engine for the first time. If possible, the engine should be hand cranked or turned by hand the first time.
  • Lash Adjuster

Additional Fitment Information:
Vehicle
1989 - Mazda 929
Showing 1 - 1 of 1 products

Loading...